A·IQ Asset & Operations Management | Planning

Plan the week. Not just the day.

Most facility teams plan day-by-day, reacting to whatever the morning meeting surfaced. Nexus Planning is a 1-2-4 week-out scheduling engine that aligns PM work, scheduled outages, and technician skills to a steady cadence.

Skill-MatchRoute-OptimizedOutage-Coordinated4-Week Horizon
02 / Capabilities

What it does.

Four functions across labor, time, and routing.

Skill

Skill-match dispatch.

Match work to technician certifications and demonstrated competencies. Train-up tracking included.

Schedule

Multi-week calendar.

PM, CM, inspections, and project work overlaid. Avoid double-booking. Coordinate around outages.

Route

Route optimization.

For multi-site portfolios, optimize technician routes across the day to cut windshield time.

Capacity

Capacity dashboards.

Are we overloaded? Underloaded? Planning shows the answer per team and per skill.

03 / In Practice

Why weekly planning matters.

A daily-only planning cadence creates artificial reactivity. Most teams discover that 70% of next week's work is already known by Friday and a 4-week-out view catches the upcoming PM compliance cliff before it happens.

A·IQ screenshot
05 / Security

Your data. Your infrastructure.

On-premise by default. Cloud-deployable when required. Your facility data never leaves your network.

TLS everywhere, secrets in vault, row-level security on every query. Containerized and isolated so one service going down never takes the rest with it.

A·IQ is built by Arcis FM, a Service-Disabled Veteran-Owned Small Business (SDVOSB). Set-aside eligible for federal contracts. CAGE 14DG6 · UEI Z95MQL2KEYG3.

TLS Everywhere
Service-to-service · client-to-server · API-to-database
On-Premise
Inside your firewall · zero cloud subscription required
Air-Gap Capable
Operates without any internet connectivity
SDVOSB Certified
CAGE 14DG6 · UEI Z95MQL2KEYG3 · set-aside eligible
Row-Level Security
Multi-tenant isolation at the database level
NIST 800-171
OT network segmentation · firmware governance
06 / Reference

Common Questions.

Engineer and operator questions on this capability.

01

Does this require GPS tracking?

Optional. Route optimization works without live GPS, just with site addresses.

02

What about subcontracted work?

Treated as a resource pool with its own capacity and cost model.

03

Can planners drag-drop assignments?

Yes. Manual override is always available.

04

How does this play with union shop rules?

Configurable. Skill match, seniority preference, and shift constraints all parameterized.

07 / Related

Pair with these.

Each Nexus module is sharper paired with the next.

Plan a steady cadence.

Walk through 4-week planning on a sample portfolio. We will show you the skill-match and route-optimization impact.

Federal & State Certifications
SBA Certified Service-Disabled Veteran-Owned Small Business California Disabled Veteran Business Enterprise California Certified Small Business